Change order of flashcards in Rise By Sharon Smith Hi I have 6 flashcards in Rise and want to move the last one to first position. Is this possible. I could not seem to click and drag or re-number?
Crystal Horn Staff over 2 years ago10/15/18 at 7:01 pm (UTC) Sure thing, Sharon! You can drag those cards in the editing pane. Check out this Peek screencast to see how.
James Igoe almost 2 years ago02/25/19 at 3:58 pm (UTC) Thanks Crystal, I was having the same issue as Sharon.
Cameo Echols almost 2 years ago03/22/19 at 5:52 pm (UTC) Is there a way to reposition the grid? For example have 2 or 4 in a row instead of 3?
Allison LaMotte Staff Cameo Echols almost 2 years ago03/25/19 at 2:24 pm (UTC) Hi Cameo, Thanks for reaching out! The grid repositions itself automatically based on the available screen real estate. There's no way to manually control that. Let me know if there's anything else I can do to help. :)
6 Replies
Sure thing, Sharon! You can drag those cards in the editing pane. Check out this Peek screencast to see how.
Thanks Crystal, I was having the same issue as Sharon.
Is there a way to reposition the grid? For example have 2 or 4 in a row instead of 3?
Hi Cameo,
Thanks for reaching out! The grid repositions itself automatically based on the available screen real estate. There's no way to manually control that.
Let me know if there's anything else I can do to help. :)
Thank you everyone!
Super helpful! Thank you.