Forum Discussion
exporting variables to be read in a Google docs spreadsheet
Hi -
I wanted to update on a wierd quirk I found in the system. I setup the variable reporting to send very long strings of information to google forms (I have been grouping multiple variables into a single string, and then separating them in excel). While variables were being reported to Google forms appropriately, it stopped sending at variable 17. I was concerned that it was a problem in terms of coding, or even google forms, but it turned out to be a problem with the volume and length of variables being reported. When I broke it up so that storyline was separately sending out half the variables at a time (as supposed to all the variables at once) it worked. Hope this helps someone...
Thanks again for all the support - I wouldn't have been able to get my project past our IRB if it wasn't for this selective reporting of variables...