Forum Discussion
Progress bar in Articulate Storyline: Easy solution, using only one built-in variable
Thank you Georg for your video and thoughts on using the variable Scene.Progress instead of Menu.Progress. However, Scene.Progress isn't an option (i.e., doesn't appear) in the trigger condition menu. Has anyone found a workaround for creating a progress bar based on scene.progress? My project file has branching based on the site where employees are assigned (scene x for location x and scene y for location y; and the scenes have different amount of slides).
In the interim, I am just using scene.progress next to the slide number (i.e., project reference option so that I can tell that slide "x.1" is from scene x and slide "y.1" is from scene y) and the scene.progress in parenthesis next to the slide number, such as "x.13 (50%)" and "y.20 (30%)". Thank you.
Sincerely,
Brandon
Hi Brandon, Sorry i missed your post.
I'm seeing scene.progress as a condition:
So if this problem persist, it might be worth opening up a support ticket with Articulate.
All the best,
Georg
- BrandonTaylo4319 months agoCommunity Member
Thank you again, Gerog. I see it now, howeveer the Scene.Progress appears as "Progress through sc ...", but appers as Scene.Progress once selected.