Forum Discussion
How are you handling SME revisions for larger content changes?
For me, it all comes down to process. I wouldn’t take an SME to a place where they can start moving things around at that stage. I own the design, the SME owns the information. I’m very deliberate about getting early sign‑off on the script, layout, and overall design using an ADDIE-style approach, specifically so we don’t end up reopening those decisions later on.
If they do want to change something small, like an image, that’s usually straightforward. They can attach the replacement image directly in Review 360 feedback, which keeps everything clear and contained.
For anything more substantial, if we really had to go there despite earlier sign‑off, I’d switch to a walkthrough. At that point I’d get very specific with them about exactly what they want to change and why. I’d also use Review 360 myself to capture clear notes, so there’s a shared, unambiguous record of what’s been agreed.
Related Content
- 1 year ago
- 1 month ago
- 4 months ago