Forum Discussion
Total course time (based on slide timelines)
Happy New Year everyone,
I have a large (~130) slide course and would like to determine the approximate time length it would take a student to run through the slides. I am not concerned with the time it will take the student to read and answer questions, just the running time (timing line is playing). I don't look forward to sitting there with a stopwatch running through the entire course, or adding up the length of each slide's timeline.
I am aware of the built-in variable ProjectElapsedTime, which I could insert and then run the entire course (instead of using a stopwatch), but I'd rather not have to spend hours clicking NEXT.
Anyone have any clues?
Thanks and cheers, Russ
1 Reply
- Ron_KatzCommunity Member
Sheri, well designed interaction with a good choice of graphic elements. Every thing works the way it should. Welcome to the challenges.
- ValerieDantecCommunity Member
J'aime beaucoup cette façon d'utiliser des images comme marqueurs.
- Sheri_MattCommunity Member
Merci!