Each question in Storyline 3 can be tied to a result slide for tracking and feedback purposes. This article describes two ways to assign a question to a result slide.

Assigning a Result Slide in Form View

In Form View, go to the Question tab on the Storyline ribbon and use the Result Slide drop-down list to select the result slide that should track the current question; or select None if the question doesn’t need to be tied to a result slide.

Assigning a Result Slide in Slide View

In Slide View, go to the Question Tools—Design tab on the Storyline ribbon and use the Result Slide drop-down list to select the result slide that should track the current question; or select None if the question doesn’t need to be tied to a result slide.