Forum Discussion
Storyline Interactions in RISE-Need quick help
I have created an interaction (7 slides) using the Serenity 06 Drag and Drop template. It imported into my RISE course fine and I am using it as a knowledge check lesson midpoint in the course. I have built a Continue button where the learner has to complete the block before moving on. When I import the interaction the Continue button is activated after completing 6 slides. Either the learner won't engage in the drag and drop interaction on the 7th slide or if they do, the slide just stays on the screen which I think could be confusing. How do I fix this in my storyline build? What trigger should I use on the last slide in Storyline or do I need to build a blank slide?
Add a course completion trigger in Storyline on slide 7 (make sure there isn't one on other slides). That is what Rise will use to track that the block is complete.
https://training.articulate.com/webinars/working-with-storyline-blocks-in-rise-360#t=1847