BonesHewitt
8 years agoCommunity Member
Timeline duration managment
Not sure if I am missing a feature or it does not exist. Adjusting extra long timelines is a pain as it seems the only method is to drag the end to the right and so reduce the overall length.
It seems to me that part of the time line seek-bar space could be used to accommodate a value which indicates the timeline duration of the active slide/layer, this value should also be editable. In this way a 405s timeline copied from elsewhere can easily be reduced to say 15s by adjusting the timeline duration value.
Any ideas available on this?