I have a course with about 100 slides (it's broken up into 4 scenes). I need to adjust the timeline on each slide but it seems that I have to do each one individually. What a pain!!! There's got to be an easier way! Is there anyway to adjust the timeline on multiple slides? I've tried selecting multiple slides on the snapshot viewer but that didn't work. Any advice?
Yikes! That does sound painful. You can adjust the length of the timeline slide by slide (not multiple slides at once).
Time saving tip: Click and drag the end of the timeline to the left, and hit the left arrow key. The timeline will jump back to the object with the longest duration.
5 Replies
Yikes! That does sound painful. You can adjust the length of the timeline slide by slide (not multiple slides at once).
Time saving tip: Click and drag the end of the timeline to the left, and hit the left arrow key. The timeline will jump back to the object with the longest duration.
Thanks for the tip Alyssa!
You are not alone Marque, I'm working on something similar.
Wonderful! Thank you.... now I have to think of new and inspirational ways to say I'm working ;)
This discussion is closed. You can start a new discussion or contact Articulate Support.