Hi everyone. I'm currently in the trial period for both Storyline 2 and Studio 13. I was wondering if there is an option to track versions of my projects after I have made an edit other than manually inserting something when naming it and saving it.
There is not an option to assign versions, so you'd need to have a manual method to do so as Jackson mentioned. It does sound like a good idea for a feature request though!
Also, welcome to the Heroes community Kevin! Hope you're enjoying the trial.
2 Replies
I don't think there is that option, I think you need to save projects with specific version names each time theres an edit.
There is not an option to assign versions, so you'd need to have a manual method to do so as Jackson mentioned. It does sound like a good idea for a feature request though!
Also, welcome to the Heroes community Kevin! Hope you're enjoying the trial.
This discussion is closed. You can start a new discussion or contact Articulate Support.