I got some interaction but I'm getting null for the date variables and a default of 0 for my grade on the certificate. I don't think I know how to make the system date work from Articulate. Also I *think* my Results_2ScorePercent=ResultsPercent trigger isn't working (hence the 0 grade on the certificate. any ideas?
Back again. Thanks for your help with the first fix but I can't seem to get the same certificate for my last modules. The variables are slightly different (REsults1.percent instead of REsults_2percent) but I am still getting a 0 score and null on the system date. Any ideas? I've attached my storyline file and the certificate used in the zip.
Update: I was able to get the score to show up. I had to switch around my triggers on the results slide (my course was ending before the javascript could report my results).
However, I still can't get the system date to show on my certificate. Any help is appreciated!
Update to my update: Turns out I didn't have the SystemDate variable in my storyline files. Got the date working again. Thanks to Russell for this fix.
10 Replies
Thanks! I’ll try these out and follow up. I have little coding skills so this has really been challenging for me.
I really wish AS would make this a feature already.
I am really struggling to do any of these new methods. Does anyone have a step by step with sample code for triggers and Javascript in the HTML page?
Bless you Matthew.
I am trying to replicate Lance Elliot's method (which is pretty much Owen Hart's method): https://community.articulate.com/discussions/building-better-courses/create-a-course-certificate-in-storyline-with-java-and-html#reply-296875
I was able to get the jpg to populate as well as my certificate image from my live course.
At this point, I just can't get my variables populated. I need the variables:
I've attached my storyline file (The certificate is the very last layer with the results page) and my certificate html.
I honestly appreciate any help on this.
Thanks Matthew,
I got some interaction but I'm getting null for the date variables and a default of 0 for my grade on the certificate. I don't think I know how to make the system date work from Articulate. Also I *think* my Results_2ScorePercent=ResultsPercent trigger isn't working (hence the 0 grade on the certificate. any ideas?
Hello all,
Just checking back on this.
Hello Aisha,
I modified slide 4.13 and added some Javascript that sets the date. I also modified the certificate a little bit.
Thank you Russell! This seems to have done it. I will do some more testing with my other modules and check back if I run into any errors.
Hi Russell,
Back again. Thanks for your help with the first fix but I can't seem to get the same certificate for my last modules. The variables are slightly different (REsults1.percent instead of REsults_2percent) but I am still getting a 0 score and null on the system date. Any ideas? I've attached my storyline file and the certificate used in the zip.
Update: I was able to get the score to show up. I had to switch around my triggers on the results slide (my course was ending before the javascript could report my results).
However, I still can't get the system date to show on my certificate. Any help is appreciated!
Update to my update: Turns out I didn't have the SystemDate variable in my storyline files. Got the date working again. Thanks to Russell for this fix.
This discussion is closed. You can start a new discussion or contact Articulate Support.