Linking a module to the LMS to record completion status

Feb 18, 2016

Hello everybody,

I have been producing some modules for my clients of which two have been loaded onto their website and LMS. They have set up the LMS so it can track if a user has logged into the modules, but the system is not tracking if they have actually completed each section.

As I have never been involved in setting up Storyline modules to talk to an LMS, I thought someone on this forum might be able to give me some instruction on how to do this. Are there any settings in the modules I need to 'tick' to create that link with the LMS?

Many thanks for any help.

Best regards

Fabienne

4 Replies
Phil Mayor

You need to publish storyline for LMS and set tracking details, either track by quiz or slides viewed you must set the completion status e.g. passed/failed. The status shouldn't matter for the LMS but in reality each LMS has its own preference.

You will also need to choose between Scorm 1.2, 2004 (4 versions) or Tin Can (xAPI) and most LMSs have preference here (although in reality most support Scorm 1.2).

Then dependent on the LMS it is either as simple as installing a scorm package or it requires grades and end points being set in the LMS.

 

This discussion is closed. You can start a new discussion or contact Articulate Support.