Question - how do i interchange order of slides

Hi, I'm a newbie to e-learning and currently using Storyline 2 (trial version). I'm facing a very frustrating problem - the slide order (for two of my slides) got interchanged somehow and i don't know how to switch them back (in the preview menu and in the story view). So instead i changed the triggers and buttons accordingly, but the viewer can see that its not completely right.

I don't know how to handle this - i even tried dragging the slides in the story view - but then all of them jump around. Please help.

3 Replies
Ali Goulet

Hi Beverly,
You should be able to switch them by dragging them in Story View as you've mentioned. Christophe gave a detailed description with screenshots to demonstrate this in his response over here. If you're still having difficulty would you mind sharing your .story file here and letting me know which two need to be switched? You can add it as an attachment right to a comment in this thread.