Rise - Labelled Graphic pop up window - change order of content?
By
Rob Buttery
Is it possible to reorder content in the pop-up window of a labelled graphic?
I'm building a labelled graphic in Rise - and for each "pop up" window I have included a title, photo, audio file and text. The vertical order that the content is displayed in the window is:
- title
- audio
- photo
- text
I would ideally like to have the audio as the last item so that the learner has to view the photo and read the text before listening to the audio. So this order:
- title
- photo
- text
- audio
If anyone has a suggestion on how to do this that would be great. Thanks Rob
4 Replies
same with process block also. There should be flexibility to place the media content as per owner wish, so that it can be created accordingly.
Hi Rob,
Unfortunately, that’s not currently possible. If you have time to log a feature request and tell us more about your specific needs, that would be super helpful!
Let me know if there’s anything else I can help you with.
Thanks Allison - I've logged a feature request for this. I hope that this gets implemented - I think a lot of learning creators would benefit. thanks
Thanks for doing that! :)