help with progress variable issue

Sep 24, 2020

I have built a progress meter that is working... but I would like a state of a button to change once it reaches 100%. I programmed it as shown here, but it does not change when the variables reaches 100. Any tips, please? 

trigger

5 Replies
Walt Hamilton

Because basic_progress is changed on slides in Scene 2, the change is not announced to Slide 1.1 (Menu). The menu never knows when basic_progress changes. Change the Menu slide to Reset to Initial value when revisited, and change the trigger to read when timeline starts on this slide.

Caveat: If the slide does not reset to initial value, the timeline will not start, but if it does reset, any previous state changes are lost (if you are using states).

This discussion is closed. You can start a new discussion or contact Articulate Support.