Tin Can - reporting duration per slide

Aug 22, 2014

Hello all,

Does anyone know if tincan statements from Storyline send the duration (time) spent on a slide in the statements?

Apparently a Tin Can statement can include a Result, and a Result type can be Duration. The guys at Watershed LRS tell me that the statements coming from my Storyline course do not include a result.duration.

thanks

Nigel


2 Replies
Maria Costa-Stienstra

Hi, Nigel.

I just wanted to share that we just released an update for Storyline 360, which includes a feature you discussed here. In Update 58, you can now:

Create timed interactions and conditional triggers using built-in variables that track the total time a learner spends on a slide, a scene, or an entire course.

To take advantage of this feature as a subscriber of Articulate 360, take a look at our step-by-step instructions here.

Please let us know if you have any questions by posting here or by reaching out to our Support Engineers directly.