Tin Can - reporting duration per slide

Hello all,

Does anyone know if tincan statements from Storyline send the duration (time) spent on a slide in the statements?

Apparently a Tin Can statement can include a Result, and a Result type can be Duration. The guys at Watershed LRS tell me that the statements coming from my Storyline course do not include a result.duration.

thanks

Nigel


1 Reply